London Paddington Closed for Christmas: Where to Park Instead (Slough, Reading and Beyond)

Where to park at Reading, Slough and Maidenhead while Paddington is closed to trains over Christmas 2026.

Station Parking During the Paddington Closure: Reading, Slough and Maidenhead Over Christmas 2026

Paddington is closed to trains from Christmas Day, and Great Western Railway (GWR) can't get back in until Monday 4 January. The good news: the line west of Slough is still running. Long-distance GWR services start and finish at Reading, and Slough and Maidenhead keep their trains too.

Reserve your space at the station you need before you leave home, and you can skip the circling and head straight for the platform.

Get £5 off your first app booking

Use code APP5 to unlock driveways, church car parks and supermarket spaces across London, and never think about parking again. Terms apply.

Download the app

Book Reading, Slough and Maidenhead Station Parking

Where?
When?

Paddington Closure Dates: What's Closed Over Christmas 2026

The closure is part of Network Rail's Dolphin Junction upgrade near Slough. More than 400 trains and 100,000 passengers pass through the junction every day, so the work needs a full shutdown of the line.

  • Paddington is closed to trains from Christmas Day (Friday 25 December). Engineers are replacing Dolphin Junction, upgrading overhead line equipment and laying new track. Most routes across the country are also shut on Christmas Day and Boxing Day.

  • No GWR trains run between Slough and Paddington from Sunday 27 December to Sunday 3 January.GWR services can't use Paddington again until Monday 4 January.

  • Long-distance GWR trains start and finish at Reading. That covers services from Penzance, Plymouth, Hereford, Great Malvern, Worcester and Swindon.

  • Some GWR services divert to London Euston. Trains from Carmarthen, Swansea and Bristol Temple Meads run via Oxford and Milton Keynes to Euston, and passengers can't board or alight at Oxford, Didcot Parkway or Reading.

  • Heathrow Express and Elizabeth line trains link Paddington and Heathrow again from Thursday 31 December. The Elizabeth line doesn't run any further west until Monday 4 January.

  • Another closure comes first. The same works also close the line over the weekend of 28 and 29 November.

Reading, Slough and Maidenhead Stations: Which Trains Are Still Running Over Christmas?

Before you drive anywhere, check what's actually running at the end of your journey. Here's what National Rail has confirmed for 27 December to 3 January.

  • Reading: GWR long-distance services start and finish here, and South Western Railway (SWR) runs trains between Reading and London Waterloo. SWR has engineering work of its own, and its Waterloo trains may be extremely busy on Monday 28 December because of the rugby at Twickenham.

  • Slough: GWR runs an amended service between Reading and Slough, and trains between Slough and Windsor & Eton Central run normally. Rail replacement buses connect Slough with London Underground and Elizabeth line stations (more on this below).

  • Maidenhead: GWR trains between Slough and Maidenhead, plus the Marlow branch, run as normal. There is no Elizabeth line service west of Heathrow until 4 January.

  • Oxford and beyond: Chiltern Railways runs between Oxford and London Marylebone, and GWR tickets are accepted on that route. If you're setting off from Oxfordshire, you can book parking near Oxford for the Chiltern service.

Getting Into London From Slough and Maidenhead Stations During the Paddington Closure

The way into London changes part-way through the closure, so check the date of your journey.

  • 27 to 30 December: Elizabeth line trains don't run between Reading and Paddington. Rail replacement buses run between Slough and Ealing Broadway or Hillingdon, where the London Underground takes over. The Piccadilly line is the only train service to Heathrow Airport.

  • 31 December onwards: Heathrow Express runs a normal service, and the Elizabeth line links Heathrow, Paddington and central London again. Rail replacement buses connect Slough with Hayes & Harlington. If you're heading to the airport, you can reserve parking near Heathrow Airport too.

  • From Monday 4 January: GWR trains return to Paddington and the Elizabeth line runs west towards Reading again.

Bus arrangements on 2 and 3 January differ slightly between stations, so check the National Rail engineering page for your exact date.

Paddington Station Parking: Driving All the Way Into London

Some people will skip the trains altogether and drive the whole way into the capital, and that's a perfectly workable plan. Paddington is closed to trains, but parking near the station and across central London can still be booked in advance.

  • Book Paddington station parking in advance from £14.60 a day, so a confirmed space is waiting when you arrive. The station stays open for toilets and other facilities, and the Elizabeth line keeps running through the central core to its low-level platforms, except on Christmas Day and Boxing Day.

  • Find parking elsewhere in London if Paddington isn't where you're headed, and reserve a space closer to your destination.

  • Check Transport for London (TfL) before you go. Congestion Charge and ULEZ rules, including any changes over the Christmas period, are set by TfL and are separate from your parking booking.

Planning Your Station Parking During the Paddington Closure

  • Check your journey the evening before. National Rail's journey planner is up to date through to 4 January.

  • Allow extra time. Rail replacement vehicles may be busier than usual.

  • Book your parking first. A reserved space means one less thing to sort on the morning.

Paddington Closure Parking FAQs: Reading, Slough and Maidenhead Station Parking

Is Paddington station closed at Christmas 2026?

Yes, to trains. Paddington is closed to trains from Christmas Day, and GWR can't use the station until Monday 4 January. Heathrow Express and the Elizabeth line link Paddington and Heathrow again from 31 December, and the station stays open for toilets and other facilities.

Where can I find Reading station parking while Paddington is closed?

Reading is where long-distance GWR services start and finish over the closure. Reading station parking can be reserved in advance with JustPark, so you know where you're parking before you leave.

Is Slough station parking still worth booking if trains don't reach Paddington?

Yes, if you're travelling to Reading, Maidenhead or Windsor & Eton Central, which all run from Slough. Slough is also where rail replacement buses pick up towards the London Underground and the Elizabeth line.

Can I still use Maidenhead station parking and catch a train?

Yes. GWR trains between Slough and Maidenhead run as normal, and the Marlow branch is unaffected. Only the Elizabeth line is off west of Heathrow until 4 January.

When do GWR trains return to Paddington?

Monday 4 January 2027. The Elizabeth line also returns west of Heathrow towards Reading from that date.

Live Near Reading, Slough or Maidenhead Station? Rent Out Your Driveway

With long-distance trains starting and finishing at Reading and replacement buses running from Slough, more drivers may be looking for somewhere to park near these stations this Christmas. If you live nearby and your driveway sits empty, you can rent out your driveway and turn it into extra income. You can also set different prices for busy dates using scheduled pricing.

Sort Your Christmas Parking Now

The Paddington closure is planned, so there's no need to leave your parking to chance. Reserve your space at Reading, Slough or Maidenhead or book parking in London before you set off, check your trains for the date you're travelling, and arrive relaxed, on time and ready for the journey ahead.

  • AppStore
  • Google Play